Electrical Engineer

Assessment criteria — Electrical Engineer

P3 — Mid-Level Professional

Canon-derived frames, not advice: every criterion is verbatim JobFrame canon or O*NET source text in a fixed frame, its labeled as observed or derived (O*NET joined at occupation-group grain for this profile). Each O*NET-sourced row also carries an score. Absent sources render as absent — nothing here is generated.

Evaluation criteria 27

  • 01Performs to standard: Inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met.

    O*NET task · observed · IM 4.48
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 02Performs to standard: Read specifications, such as blueprints, to determine construction requirements or to plan procedures.

    O*NET task · observed · IM 4.37
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 03Performs to standard: Supervise, coordinate, or schedule the activities of construction or extractive workers.

    O*NET task · observed · IM 4.36
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 04Performs to standard: Assign work to employees, based on material or worker requirements of specific jobs.

    O*NET task · observed · IM 4.22
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 05Performs to standard: Coordinate work activities with other construction project activities.

    O*NET task · observed · IM 4.16
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 06Performs to standard: Estimate material or worker requirements to complete jobs.

    O*NET task · observed · IM 4.14
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 07Performs to standard: Analyze worker or production problems and recommend solutions, such as improving production methods or implementing motivational plans.

    O*NET task · observed · IM 4.11
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 08Performs to standard: Order or requisition materials or supplies.

    O*NET task · observed · IM 4.03
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 09Performs to standard: Train workers in construction methods, operation of equipment, safety procedures, or company policies.

    O*NET task · observed · IM 4.01
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 10Performs to standard: Locate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment.

    O*NET task · observed · IM 3.92
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 11Performs to standard: Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities.

    O*NET task · observed · IM 3.91
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 12Performs to standard: Arrange for repairs of equipment or machinery.

    O*NET task · observed · IM 3.82
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 13Effectiveness at: Mark reference points on construction materials.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 14Effectiveness at: Review blueprints or specifications to determine work requirements.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 15Effectiveness at: Measure materials or objects for installation or assembly.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 16Effectiveness at: Clean equipment or facilities.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 17Effectiveness at: Assemble temporary equipment or structures.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 18Effectiveness at: Direct construction or extraction personnel.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 19Effectiveness at: Measure work site dimensions.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 20Effectiveness at: Mix substances or compounds needed for work activities.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 21Effectiveness at: Operate cranes, hoists, or other moving or lifting equipment.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 22Effectiveness at: Apply sealants or other protective coatings.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 23Effectiveness at: Apply material to fill gaps in surfaces.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 24Effectiveness at: Move construction or extraction materials to locations where they are needed.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 25Effectiveness at: Install metal structural components.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 26Effectiveness at: Cut metal components for installation.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 27Effectiveness at: Maintain construction tools or equipment.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

Performance standards at this level 21

What good looks like at this level, by dimension — verbatim level and JFM rubric text, with this profile's performance metrics attached where a real keyword match exists. Work activities are O*NET-derived (basis: derived).

  • Scope

    canon · level dimension · observed

    Features or a sub-system end-to-end

  • Autonomy

    canon · level dimension · observed

    Works independently on standard work; reviewed on the non-standard

  • Complexity

    canon · level dimension · observed

    Diverse problems; adapts existing approaches

  • Impact

    canon · level dimension · observed

    Project / team outcomes

  • Decision rights

    canon · level dimension · observed

    Owns implementation decisions for own scope

  • Leadership

    canon · level dimension · observed

    Mentors juniors informally

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Mark reference points on construction materials.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Review blueprints or specifications to determine work requirements.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Measure materials or objects for installation or assembly.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Clean equipment or facilities.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Assemble temporary equipment or structures.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Direct construction or extraction personnel.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Measure work site dimensions.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Mix substances or compounds needed for work activities.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Operate cranes, hoists, or other moving or lifting equipment.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Apply sealants or other protective coatings.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Apply material to fill gaps in surfaces.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Move construction or extraction materials to locations where they are needed.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Install metal structural components.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Cut metal components for installation.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Maintain construction tools or equipment.

Structured-interview dimensions

The work-style constructs a structured interview for this occupation should probe (importance-ranked). Pair with past-behavior questions and anchored rating scales — the evidence-backed format.

Dependability2.32Leadership Orientation2.22Attention to Detail2Cautiousness1.86Perseverance1.38Stress Tolerance1.31Integrity1.18Cooperation1.14

Level-calibrated behavioral anchors 28

Verbatim anchors from open leveled frameworks, mapped onto this profile's level (basis: derived — competency-scoped, not per-criterion). Use them to calibrate what "exceeds / meets" looks like at this level.

  • Creativity and Innovation

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Creates a new quality control system to monitor unit processes Uses cutting-edge ideas to develop business unit services Works with coworkers to coordinate a project using a creative process

  • External Awareness

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Gathers and summarizes information to predict stakeholder views on a new policy Considers external policies and trends when reviewing correspondence, reports, and policy documents

  • Flexibility

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Uses staff feedback to streamline processes in order to meet deadlines Adjusts project plan based on input from staff and stakeholders

  • Resilience

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Meets with employees resistant to organizational change to address concerns Maintains composure and direction in high- pressure situations Accepts negative feedback in a constructive manner and adjusts behavior accordingly

  • Strategic Thinking

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Considers customer needs and trends in the development of strategic plans Implements strategic objectives and develops metrics to assess attainment of work unit goals

  • Vision

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Involves staff in setting annual goals to ensure buy-in Conducts interviews with staff to ascertain organization's needs Conveys vision of agency to staff and stakeholders

  • Conflict Management

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Implements changes to ensure work environment is fair and equitable based on employee concerns Ensures employees receive mediation to resolve issues affecting the workgroup Resolves issues by meeting one-on-one with team member

  • Leveraging Diversity

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Adheres to EEO policies, goals, objectives, and philosophies of valuing diversity in performing everyday duties and responsibilities Builds teams leveraging diverse capabilities of staff

  • Developing Others

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Encourages employees to participate in mentoring programs and other learning opportunities Pairs new staff with seasoned employees to facilitate understanding of the position and organization Provides orientation to new employees

  • Team Building

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Encourages staff to share skills and abilities within work group to facilitate completion of challenging tasks Forms teams to identify and address agency concerns Informs team members of issues requiring resolution and considers input

  • Accountability

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Investigates claims of employee violations and encourages staff to take responsibility for actions Outlines goals and assesses workgroup progress towards goal achievement Plans and researches safety issues and contacts agency to ensure safety standards are fully utilized Distributes workload among staff to ensure staff meet key deliverables

  • Customer Service

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Develops guides and user manuals for customers Ensures products and services comply with customer requirements Streamlines procedures based on customer feedback

  • Decisiveness

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Makes sound and timely decisions for a project, team, or work unit Seeks out best practices to make organizational decisions

  • Entrepreneurship

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Identifies concepts for new programs, products, or services Seeks feedback for new products or services based on customer needs

  • Problem Solving

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Addresses routine organizational problems by leading a team to brainstorm solutions Establishes guidelines to clarify complex and/or controversial processes

  • Technical Credibility

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Provides staff with feedback and support on technical issues Makes technically sound recommendations to develop effective work products

  • Financial Management

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Justifies requested budget allocation to management in relation to program objectives Allocates program budget across multiple projects

  • Human Capital Management

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Recognizes and addresses deficiencies of human resources processes or tools Provides positive feedback to high-performing staff and rewards exceptional performance Considers impact of personnel decisions on current staff

  • Technology Management

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Works with contractors to implement an IT system change to meet requirements of a new legislative mandate Researches information technology systems to meet specific program needs Adapts processes to keep pace with new technological developments

  • Partnering

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Considers stakeholder input when developing strategies to ensure mutually agreeable initiatives Coordinates with various agencies to plan and conduct annual events Coordinates across and within organizations to determine required resources to support goals Works with a team of managers or employees across agencies to address mutual issues and concerns

  • Political Savvy

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Addresses political issues that may impact internal and external stakeholders Develops relationships with new political leaders in the agency

  • Influencing/Negotiating

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Meets with team leaders to gain buy-in for new direction of division Uses factual information to support own point of view when meeting with team members

  • Interpersonal Skills

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Shows employees empathy and respect Welcomes new employees into organization by explaining mission and agency goals

  • Oral Communication

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Communicates effectively with staff by conducting regular meetings to discuss initiatives and current events Explains and clarifies policy to affected parties Provides status updates to management team during quarterly division meeting

  • Integrity/Honesty

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Provides staff with accurate information about the vision of the agency and outlines changes in an upfront manner Remains fair and objective when determining skill set needed for projects to select effective team members

  • Written Communication

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Writes daily briefs or guidelines to ensure employees are provided with updated information Develops press releases to ensure important issues are addressed

  • Continual Learning

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Solicits periodic feedback to continually improve quality of own work Visits other work sites to gain understanding of staff functions and daily tasks

  • Public Service Motivation

    OPM Leadership Proficiency Levels · Level 2 - Basic

    Reviews unit's policies and procedures on a regular basis to ensure they are consistent with public needs Determines community needs by surveying citizens

This page includes information from the O*NET 30.3 Database by the U.S. Department of Labor, Employment and Training Administration (USDOL/ETA). Used under the CC BY 4.0 license (https://creativecommons.org/licenses/by/4.0/). O*NET® is a trademark of USDOL/ETA. USDOL/ETA has modified all or some of this information. USDOL/ETA has not approved, endorsed, or tested these modifications.

Own the full kit — $29

The complete work-products kit for one canonical job profile: level-scoped evaluation criteria with BARS frames, structured-interview dimensions and guide, performance criteria, and goal/scorecard templates — all canon-grounded and basis-labeled.

Assessment Kit — One Profile

$29

The complete work-products kit for one canonical job profile: level-scoped evaluation criteria with BARS frames, structured-interview dimensions and guide, performance criteria, and goal/scorecard templates — all canon-grounded and basis-labeled.

Assessment Kit — Family Bundle

$99

Work-products kits for every level and focus in one job family — the hiring-manager shape: assess, interview, and set goals across the whole ladder consistently.

Assessment Kits — All Access (Monthly)

$49/mo

Every work-products kit across all canonical profiles, refreshed as source editions land.

Assessment Kits — All Access (Annual)

$490/yr

Every work-products kit across all canonical profiles, refreshed as source editions land. Annual billing (two months free).

This page is the kit's free demonstration and stays free. The paid kit is the complete work-products export for the profile.