Principal Drilling Engineer

Assessment criteria — Principal Drilling Engineer

P6 — Principal Professional

Canon-derived frames, not advice: every criterion is verbatim JobFrame canon or O*NET source text in a fixed frame, its labeled as observed or derived (O*NET joined at occupation-group grain for this profile). Each O*NET-sourced row also carries an score. Absent sources render as absent — nothing here is generated.

Evaluation criteria 27

  • 01Performs to standard: Inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met.

    O*NET task · observed · IM 4.48
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 02Performs to standard: Read specifications, such as blueprints, to determine construction requirements or to plan procedures.

    O*NET task · observed · IM 4.37
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 03Performs to standard: Supervise, coordinate, or schedule the activities of construction or extractive workers.

    O*NET task · observed · IM 4.36
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 04Performs to standard: Assign work to employees, based on material or worker requirements of specific jobs.

    O*NET task · observed · IM 4.22
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 05Performs to standard: Coordinate work activities with other construction project activities.

    O*NET task · observed · IM 4.16
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 06Performs to standard: Estimate material or worker requirements to complete jobs.

    O*NET task · observed · IM 4.14
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 07Performs to standard: Analyze worker or production problems and recommend solutions, such as improving production methods or implementing motivational plans.

    O*NET task · observed · IM 4.11
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 08Performs to standard: Order or requisition materials or supplies.

    O*NET task · observed · IM 4.03
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 09Performs to standard: Train workers in construction methods, operation of equipment, safety procedures, or company policies.

    O*NET task · observed · IM 4.01
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 10Performs to standard: Locate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment.

    O*NET task · observed · IM 3.92
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 11Performs to standard: Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities.

    O*NET task · observed · IM 3.91
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 12Performs to standard: Arrange for repairs of equipment or machinery.

    O*NET task · observed · IM 3.82
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 13Effectiveness at: Mark reference points on construction materials.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 14Effectiveness at: Review blueprints or specifications to determine work requirements.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 15Effectiveness at: Measure materials or objects for installation or assembly.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 16Effectiveness at: Clean equipment or facilities.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 17Effectiveness at: Assemble temporary equipment or structures.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 18Effectiveness at: Direct construction or extraction personnel.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 19Effectiveness at: Measure work site dimensions.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 20Effectiveness at: Mix substances or compounds needed for work activities.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 21Effectiveness at: Operate cranes, hoists, or other moving or lifting equipment.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 22Effectiveness at: Apply sealants or other protective coatings.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 23Effectiveness at: Apply material to fill gaps in surfaces.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 24Effectiveness at: Move construction or extraction materials to locations where they are needed.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 25Effectiveness at: Install metal structural components.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 26Effectiveness at: Cut metal components for installation.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

  • 27Effectiveness at: Maintain construction tools or equipment.

    O*NET work activity · observed
    Rating frame (5-point )
    5 · Exceeds
    — rating anchor pending —
    3 · Meets
    — rating anchor pending —
    1 · Below
    — rating anchor pending —

    Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.

Performance standards at this level 21

What good looks like at this level, by dimension — verbatim level and JFM rubric text, with this profile's performance metrics attached where a real keyword match exists. Work activities are O*NET-derived (basis: derived).

  • Scope

    canon · level dimension · observed

    Organization-wide architecture and the hardest problems

  • Autonomy

    canon · level dimension · observed

    Defines direction; minimal oversight

  • Complexity

    canon · level dimension · observed

    Strategic, open-ended problems shaping the technical future

  • Impact

    canon · level dimension · observed

    Organization-wide

  • Decision rights

    canon · level dimension · observed

    Sets technical strategy for a major area

  • Leadership

    canon · level dimension · observed

    Recognized authority; multiplies many teams

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Mark reference points on construction materials.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Review blueprints or specifications to determine work requirements.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Measure materials or objects for installation or assembly.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Clean equipment or facilities.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Assemble temporary equipment or structures.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Direct construction or extraction personnel.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Measure work site dimensions.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Mix substances or compounds needed for work activities.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Operate cranes, hoists, or other moving or lifting equipment.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Apply sealants or other protective coatings.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Apply material to fill gaps in surfaces.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Move construction or extraction materials to locations where they are needed.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Install metal structural components.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Cut metal components for installation.

  • Work activities

    O*NET work activity · derived

    Effectiveness at: Maintain construction tools or equipment.

Structured-interview dimensions

The work-style constructs a structured interview for this occupation should probe (importance-ranked). Pair with past-behavior questions and anchored rating scales — the evidence-backed format.

Dependability2.32Leadership Orientation2.22Attention to Detail2Cautiousness1.86Perseverance1.38Stress Tolerance1.31Integrity1.18Cooperation1.14

Level-calibrated behavioral anchors 28

Verbatim anchors from open leveled frameworks, mapped onto this profile's level (basis: derived — competency-scoped, not per-criterion). Use them to calibrate what "exceeds / meets" looks like at this level.

  • Creativity and Innovation

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Creates new methods for planning, designing, and carrying out program objectives Organizes and leads cross-divisional work group in developing creative solutions to address problems Creates new units to streamline functions based on work flow analysis

  • External Awareness

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Provides policy advice to officials which are consistent with local, national, and international policies and trends Reflects industry best practices in the development of agency-wide policies and procedures

  • Flexibility

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Adjusts organizational priorities quickly as situations change Shifts agency goals and initiatives to align with administration and Congressional priorities

  • Resilience

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Responds to setbacks by developing alternative approaches to determine the best course of action Maintains unit's effectiveness, quality, and morale during organizational change Cultivates internal and external stakeholders to develop strategies for obtaining funding from alternate sources following budget cuts

  • Strategic Thinking

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Leads and directs a strategic planning team to address and outline the future direction of an organization Establishes strategic performance measures to allow the organization to continually assess and adjust program direction

  • Vision

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Directs and provides guidance to managers to develop long-term strategic plan for the division Educates agency officials about new system and outlines how the long-term benefits align with agency goals Conducts workshop with employees, human resources staff, and customers to build a vision, strategy, and goals for the unit

  • Conflict Management

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Recognizes conflict and takes steps to address issues by meeting with the involved parties Mitigates staff concerns regarding agency-wide issues by investigating allegations and taking appropriate action

  • Leveraging Diversity

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Builds a diverse staff with a variety of skills who function effectively to accomplish the mission of the organization Develops a creative initiative focused on recognizing the various dimensions of diversity to encourage inclusiveness in the workplace

  • Developing Others

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Recommends details and developmental assignments to staff based on career interests and work unit needs Recognizes staff potential and guides employees in developing skills by recommending appropriate training and sources of information Works with staff to develop individual development plans addressing employee needs and meeting organizational goals

  • Team Building

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Promotes cohesiveness of a dysfunctional team by defining roles and responsibilities of each team member and establishing overall objectives Leads teams to implement Congressional programs and interact with legislative representatives Motivates agency-wide team by assigning work based on team member skill level and area of interest

  • Accountability

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Provides and promotes position information across divisions to educate staff on respective duties, performance expectations, and consequent impact on accomplishment of agency goals Holds staff accountable for new performance standards and expectations by taking action with employees not meeting standards

  • Customer Service

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Anticipates growing customer needs and expectations to continuously improve product development and service delivery Creates work group consisting of stakeholders and neutral parties to develop solutions to customer service barriers

  • Decisiveness

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Changes course of action despite public support when new information indicates previous strategy would not succeed Makes timely decisions using available information regarding severe operating budget reductions including possible reductions in force (RIFs)

  • Entrepreneurship

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Takes calculated risks by creating new and innovative business lines Conducts research and develops business proposals resulting in a high return on investment

  • Problem Solving

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Synthesizes information from internal and external sources to develop an action plan addressing program issues Addresses systemic barriers inhibiting the achievement of results by forming teams to conduct focus groups and develop solutions

  • Technical Credibility

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Provides expertise in technical subject area to an organization or team Develops technical portions of agency guidelines for internal and external use Evaluates, incorporates, and communicates the latest developments in specialty area through agency guidelines and criteria Provides technical expertise in the design and implementation of agency-wide projects

  • Financial Management

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Develops and implements new procurement system to support agency program within time and budgetary constraints Ensures financial commitments and deadlines are met by facilitating and assessing processes, situations, and issues and takes corrective action, as needed Considers implications of financial decisions and suggests methods for meeting needs of staff and the organization overall Develops, justifies, and manages organization- wide budgets for annual projects and programs

  • Human Capital Management

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Develops rewards system to recognize the impact of employee contributions to the organization Identifies creative strategies to recruit employees with the required skills and qualifications, despite having limited resources Identifies mission critical occupations and associated competencies needed to perform organizational functions

  • Technology Management

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Improves ability of agency to gather and act on data from stakeholders by using online surveys and related IT tools Improves agency productivity by expanding the use of existing IT applications for use by clients and staff

  • Partnering

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Collaborates with headquarters, regional offices, and key stakeholders to implement new initiatives Partners with various parties by sharing information and resources across multiple levels to establish new programs

  • Political Savvy

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Ensures staff understands documentation and required metrics to analyze political issues Meets with community leaders to discuss political issues and address concerns Establishes a clear vision for the organization by meeting with managers agency-wide to ensure initiatives are understood Addresses controversial political issues by conducting research and considering best practices

  • Influencing/Negotiating

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Negotiates with leaders for changes to reorganization design based on feedback from subordinates Develops plan and convinces high-level agency officials to adopt approach by meeting with officials to explain points Guides a team of experts to provide advice on, and build credibility for, a multi-level negotiation process

  • Interpersonal Skills

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Treats individuals from all levels of the agency with courtesy and sensitivity Meets with staff and listens to their perspective on organizational policies and procedures

  • Oral Communication

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Conducts presentations and briefings for high- level agency officials Presents, explains, and defends agency positions and proposals to staff and stakeholders

  • Integrity/Honesty

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Instills a climate of trust by admitting own mistakes and taking responsibility for one's actions Discusses potential ethical problems and wrong- doing with employees and responds appropriately

  • Written Communication

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Writes complex technical reports using clear terminology and a concise format for use by high- level decision makers Reviews technical reports, edits materials, and provides suggestions to improve clarity while ensuring documents are targeted to the intended audience

  • Continual Learning

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Completes leadership development program including training, coaching, and mentoring opportunities and applies key learnings Arranges and completes rotational assignment meeting own developmental goals and aligning with organizational strategies

  • Public Service Motivation

    OPM Leadership Proficiency Levels · Level 4 - Advanced

    Partners with community leaders to develop neighborhood action plans Cultivates relationships with community stakeholders to validate usefulness of proposed products and services

This page includes information from the O*NET 30.3 Database by the U.S. Department of Labor, Employment and Training Administration (USDOL/ETA). Used under the CC BY 4.0 license (https://creativecommons.org/licenses/by/4.0/). O*NET® is a trademark of USDOL/ETA. USDOL/ETA has modified all or some of this information. USDOL/ETA has not approved, endorsed, or tested these modifications.

Own the full kit — $29

The complete work-products kit for one canonical job profile: level-scoped evaluation criteria with BARS frames, structured-interview dimensions and guide, performance criteria, and goal/scorecard templates — all canon-grounded and basis-labeled.

Assessment Kit — One Profile

$29

The complete work-products kit for one canonical job profile: level-scoped evaluation criteria with BARS frames, structured-interview dimensions and guide, performance criteria, and goal/scorecard templates — all canon-grounded and basis-labeled.

Assessment Kit — Family Bundle

$99

Work-products kits for every level and focus in one job family — the hiring-manager shape: assess, interview, and set goals across the whole ladder consistently.

Assessment Kits — All Access (Monthly)

$49/mo

Every work-products kit across all canonical profiles, refreshed as source editions land.

Assessment Kits — All Access (Annual)

$490/yr

Every work-products kit across all canonical profiles, refreshed as source editions land. Annual billing (two months free).

This page is the kit's free demonstration and stays free. The paid kit is the complete work-products export for the profile.