Program & Portfolio Management — M4

Goal templates — Program & Portfolio Management — M4

R&D Program & Project Management · Program & Portfolio Management · M4 — Director

These are canon-derived frames, not advice: every line is either verbatim JobFrame canon text or a fixed template wrapping it. ⟨target⟩ / ⟨baseline⟩ / ⟨date⟩ are placeholders for the manager to fill in. Nothing here is generated by AI — rows are omitted, never invented, when the canon lacks the underlying field.

SMART goals

One row per canon core output / responsibility this level owns.

JFM responsibility (M4)

Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs

Specific
Deliver: "Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs"
Measurable
Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
Achievable
Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
Relevant
Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
Time-bound
⟨date⟩

JFM responsibility (M4)

In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects

Specific
Deliver: "In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects"
Measurable
Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
Achievable
Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
Relevant
Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
Time-bound
⟨date⟩

JFM responsibility (M4)

Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management

Specific
Deliver: "Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management"
Measurable
Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
Achievable
Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
Relevant
Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
Time-bound
⟨date⟩

JFM responsibility (M4)

Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area

Specific
Deliver: "Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area"
Measurable
Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
Achievable
Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
Relevant
Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
Time-bound
⟨date⟩

JFM responsibility (M4)

Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards

Specific
Deliver: "Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards"
Measurable
Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
Achievable
Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
Relevant
Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
Time-bound
⟨date⟩
Copy / print as textshow ▾
1. Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs  [source: JFM responsibility (M4)]
   Specific:    Deliver: "Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs"
   Measurable:  Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
   Achievable:  Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
   Relevant:    Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
   Time-bound:  ⟨date⟩

2. In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects  [source: JFM responsibility (M4)]
   Specific:    Deliver: "In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects"
   Measurable:  Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
   Achievable:  Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
   Relevant:    Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
   Time-bound:  ⟨date⟩

3. Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management  [source: JFM responsibility (M4)]
   Specific:    Deliver: "Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management"
   Measurable:  Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
   Achievable:  Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
   Relevant:    Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
   Time-bound:  ⟨date⟩

4. Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area  [source: JFM responsibility (M4)]
   Specific:    Deliver: "Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area"
   Measurable:  Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
   Achievable:  Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
   Relevant:    Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
   Time-bound:  ⟨date⟩

5. Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards  [source: JFM responsibility (M4)]
   Specific:    Deliver: "Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards"
   Measurable:  Move the metric this drives from ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩.
   Achievable:  Scoped to this level's jfm complexity/problem-solving rubric: "Strategic issues where program slippage could jeopardize key activities; integrates post-research assets through lifecycle management."
   Relevant:    Advances the R&D Program & Project Management · Program & Portfolio Management mandate for a M4 — Director.
   Time-bound:  ⟨date⟩

OKRs

Objectives from this level's core outputs; key results only where a real dimension or capability backs them.

JFM responsibility (M4)

Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs

  • From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs"
  • Evidence at this level's scope bar: "A function or department" — ⟨target⟩ by ⟨date⟩

JFM responsibility (M4)

In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects

  • From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects"
  • Evidence at this level's autonomy bar: "Owns area strategy and budget" — ⟨target⟩ by ⟨date⟩

JFM responsibility (M4)

Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management

  • From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management"
  • Evidence at this level's complexity bar: "Strategic priorities and cross-functional alignment" — ⟨target⟩ by ⟨date⟩

JFM responsibility (M4)

Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area

  • From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area"
  • Evidence at this level's impact bar: "Function-level results" — ⟨target⟩ by ⟨date⟩

JFM responsibility (M4)

Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards

  • From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards"
  • Evidence at this level's decision rights bar: "Owns strategy, budget, and org design for the area" — ⟨target⟩ by ⟨date⟩
Copy / print as textshow ▾
Objective 1: Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs  [source: JFM responsibility (M4)]
  KR1. From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs"
  KR2. Evidence at this level's scope bar: "A function or department" — ⟨target⟩ by ⟨date⟩

Objective 2: In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects  [source: JFM responsibility (M4)]
  KR1. From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects"
  KR2. Evidence at this level's autonomy bar: "Owns area strategy and budget" — ⟨target⟩ by ⟨date⟩

Objective 3: Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management  [source: JFM responsibility (M4)]
  KR1. From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management"
  KR2. Evidence at this level's complexity bar: "Strategic priorities and cross-functional alignment" — ⟨target⟩ by ⟨date⟩

Objective 4: Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area  [source: JFM responsibility (M4)]
  KR1. From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area"
  KR2. Evidence at this level's impact bar: "Function-level results" — ⟨target⟩ by ⟨date⟩

Objective 5: Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards  [source: JFM responsibility (M4)]
  KR1. From ⟨baseline⟩ to ⟨target⟩ by ⟨date⟩ — tied to: "Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards"
  KR2. Evidence at this level's decision rights bar: "Owns strategy, budget, and org design for the area" — ⟨target⟩ by ⟨date⟩

MBO areas

Key result areas from this level's responsibilities, each with a standard grounded in the canon leveling rubric where one exists.

AreaStandardTargetDue
Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programsConsistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."⟨target⟩⟨date⟩
In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projectsConsistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."⟨target⟩⟨date⟩
Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle managementConsistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."⟨target⟩⟨date⟩
Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed areaConsistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."⟨target⟩⟨date⟩
Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standardsConsistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."⟨target⟩⟨date⟩
Copy / print as textshow ▾
1. Area: Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs  [source: JFM responsibility (M4) — reused, no distinct responsibility content]
   Standard: Consistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."
   Target:   ⟨target⟩   Due: ⟨date⟩

2. Area: In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects  [source: JFM responsibility (M4) — reused, no distinct responsibility content]
   Standard: Consistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."
   Target:   ⟨target⟩   Due: ⟨date⟩

3. Area: Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management  [source: JFM responsibility (M4) — reused, no distinct responsibility content]
   Standard: Consistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."
   Target:   ⟨target⟩   Due: ⟨date⟩

4. Area: Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area  [source: JFM responsibility (M4) — reused, no distinct responsibility content]
   Standard: Consistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."
   Target:   ⟨target⟩   Due: ⟨date⟩

5. Area: Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards  [source: JFM responsibility (M4) — reused, no distinct responsibility content]
   Standard: Consistent with this level's jfm knowledge-application rubric: "Sets strategic PPM policies (PTRS weighting, decision-analysis standards) aligned with R&D business objectives across multiple teams/sections."
   Target:   ⟨target⟩   Due: ⟨date⟩

Scorecard

Only perspectives with real canon backing are shown — no Financial or Customer perspective, since nothing in the canon grounds business-financial or customer measures for a role alone.

Internal process

  • "Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs"⟨target⟩ by ⟨date⟩
  • "In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects"⟨target⟩ by ⟨date⟩
  • "Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management"⟨target⟩ by ⟨date⟩
  • "Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area"⟨target⟩ by ⟨date⟩
  • "Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards"⟨target⟩ by ⟨date⟩

Role calibration

  • Meets the scope bar: "A function or department"⟨target⟩ by ⟨date⟩
  • Meets the autonomy bar: "Owns area strategy and budget"⟨target⟩ by ⟨date⟩
  • Meets the complexity bar: "Strategic priorities and cross-functional alignment"⟨target⟩ by ⟨date⟩
  • Meets the impact bar: "Function-level results"⟨target⟩ by ⟨date⟩
  • Meets the decision rights bar: "Owns strategy, budget, and org design for the area"⟨target⟩ by ⟨date⟩
  • Meets the leadership bar: "Leads managers; sets direction for the function"⟨target⟩ by ⟨date⟩
Copy / print as textshow ▾
Internal process
  - "Manages multiple PPM teams or a critical portfolio function, aligning execution plans with R&D business objectives where slippage could jeopardize key programs"  →  ⟨target⟩ by ⟨date⟩   [source: JFM responsibility (M4)]
  - "In partnership with the Research Project Director, develops team strategy and ensures aligned execution across multiple research projects"  →  ⟨target⟩ by ⟨date⟩   [source: JFM responsibility (M4)]
  - "Serves as operational leader of assigned research assets and teams, integrating the development portfolio of post-research assets through lifecycle management"  →  ⟨target⟩ by ⟨date⟩   [source: JFM responsibility (M4)]
  - "Engages senior leaders on functional PPM strategy, resource/capacity planning and stage-gate readiness across the managed area"  →  ⟨target⟩ by ⟨date⟩   [source: JFM responsibility (M4)]
  - "Establishes and enforces strategic policies for portfolio reporting, PTRS-weighted prioritization and decision-analysis standards"  →  ⟨target⟩ by ⟨date⟩   [source: JFM responsibility (M4)]

Role calibration
  - Meets the scope bar: "A function or department"  →  ⟨target⟩ by ⟨date⟩   [source: level dimension (Scope)]
  - Meets the autonomy bar: "Owns area strategy and budget"  →  ⟨target⟩ by ⟨date⟩   [source: level dimension (Autonomy)]
  - Meets the complexity bar: "Strategic priorities and cross-functional alignment"  →  ⟨target⟩ by ⟨date⟩   [source: level dimension (Complexity)]
  - Meets the impact bar: "Function-level results"  →  ⟨target⟩ by ⟨date⟩   [source: level dimension (Impact)]
  - Meets the decision rights bar: "Owns strategy, budget, and org design for the area"  →  ⟨target⟩ by ⟨date⟩   [source: level dimension (Decision rights)]
  - Meets the leadership bar: "Leads managers; sets direction for the function"  →  ⟨target⟩ by ⟨date⟩   [source: level dimension (Leadership)]