Assessment criteria — Engineering and Advanced Manufacturing Lead Electrical Engineer
P6 — Principal Professional
Canon-derived frames, not advice: every criterion is verbatim JobFrame canon or O*NET source text in a fixed frame, its labeled as observed or derived (O*NET joined at occupation-group grain for this profile). Each O*NET-sourced row also carries an score. Absent sources render as absent — nothing here is generated.
Evaluation criteria 42
01Delivers on: Oversee end-to-end mechanical design for new products and systems.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
02Delivers on: Innovate and optimize mechanical solutions to meet market and customer needs.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
03Delivers on: Ensure compliance with industry standards and regulations.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
04Delivers on: Collaborate with cross-functional teams to integrate mechanical designs.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
05Delivers on: Mentor junior engineers and provide technical guidance.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
06Delivers on: Architect electrical systems and lead the design of complex electrical system architecture.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
07Delivers on: Develop schematics, wiring diagrams, and layouts for electrical components.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
08Delivers on: Ensure system reliability and performance standards are met.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
09Delivers on: Lead cross-functional teams in electrical design projects.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
10Delivers on: Mentor and develop junior electrical engineers.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
11Delivers on: Plan and design infrastructure projects ensuring compliance with regulations.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
12Delivers on: Develop project scopes, budgets, and schedules for engineering work.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
13Delivers on: Lead project teams and coordinate cross-functional efforts.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
14Delivers on: Ensure project delivery within budget and timeline constraints.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
15Delivers on: Mentor and guide project engineers.
canon · responsibility · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
16Performs to standard: Develop final construction plans that include aesthetic representations of the structure or details for its construction.
O*NET task · observed · IM 4.48Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
17Performs to standard: Prepare scale drawings or architectural designs, using computer-aided design or other tools.
O*NET task · observed · IM 4.43Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
18Performs to standard: Prepare information regarding design, structure specifications, materials, color, equipment, estimated costs, or construction time.
O*NET task · observed · IM 4.4Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
19Performs to standard: Consult with clients to determine functional or spatial requirements of structures.
O*NET task · observed · IM 4.38Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
20Performs to standard: Meet with clients to review or discuss architectural drawings.
O*NET task · observed · IM 4.38Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
21Performs to standard: Monitor the work of specialists, such as electrical engineers, mechanical engineers, interior designers, or sound specialists to ensure optimal form or function of designs or final structures.
O*NET task · observed · IM 4.33Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
22Performs to standard: Integrate engineering elements into unified architectural designs.
O*NET task · observed · IM 4.33Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
23Performs to standard: Plan layouts of structural architectural projects.
O*NET task · observed · IM 4.25Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
24Performs to standard: Conduct periodic on-site observations of construction work to monitor compliance with plans.
O*NET task · observed · IM 4.2Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
25Performs to standard: Prepare contract documents for building contractors.
O*NET task · observed · IM 4.1Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
26Performs to standard: Plan or design structures such as residences, office buildings, theatres, factories, or other structural properties in accordance with environmental, safety, or other regulations.
O*NET task · observed · IM 4.1Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
27Performs to standard: Direct activities of technicians engaged in preparing drawings or specification documents.
O*NET task · observed · IM 4Rating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
28Effectiveness at: Test performance of electrical, electronic, mechanical, or integrated systems or equipment.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
29Effectiveness at: Prepare detailed work plans.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
30Effectiveness at: Confer with technical personnel to prepare designs or operational plans.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
31Effectiveness at: Supervise engineering or other technical personnel.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
32Effectiveness at: Recommend technical design or process changes to improve efficiency, quality, or performance.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
33Effectiveness at: Maintain operational records or records systems.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
34Effectiveness at: Evaluate designs or specifications to ensure quality.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
35Effectiveness at: Review technical documents to plan work.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
36Effectiveness at: Document technical design details.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
37Effectiveness at: Document design or operational test results.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
38Effectiveness at: Provide technical guidance to other personnel.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
39Effectiveness at: Evaluate characteristics of equipment or systems.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
40Effectiveness at: Develop technical methods or processes.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
41Effectiveness at: Inspect facilities or sites to determine if they meet specifications or standards.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
42Effectiveness at: Determine operational methods.
O*NET work activity · observedRating frame (5-point )
- 5 · Exceeds
- — rating anchor pending —
- 3 · Meets
- — rating anchor pending —
- 1 · Below
- — rating anchor pending —
Rating anchors are completed by the rater against observed behavior — leveled anchor text lands with the next source edition.
Performance standards at this level 21
What good looks like at this level, by dimension — verbatim level and JFM rubric text, with this profile's performance metrics attached where a real keyword match exists. Work activities are O*NET-derived (basis: derived).
Scope
canon · level dimension · observedOrganization-wide architecture and the hardest problems
Autonomy
canon · level dimension · observedDefines direction; minimal oversight
Complexity
canon · level dimension · observedStrategic, open-ended problems shaping the technical future
Impact
canon · level dimension · observedOrganization-wide
Decision rights
canon · level dimension · observedSets technical strategy for a major area
Leadership
canon · level dimension · observedRecognized authority; multiplies many teams
Work activities
O*NET work activity · derivedEffectiveness at: Test performance of electrical, electronic, mechanical, or integrated systems or equipment.
Work activities
O*NET work activity · derivedEffectiveness at: Prepare detailed work plans.
Work activities
O*NET work activity · derivedEffectiveness at: Confer with technical personnel to prepare designs or operational plans.
Work activities
O*NET work activity · derivedEffectiveness at: Supervise engineering or other technical personnel.
Work activities
O*NET work activity · derivedEffectiveness at: Recommend technical design or process changes to improve efficiency, quality, or performance.
Work activities
O*NET work activity · derivedEffectiveness at: Maintain operational records or records systems.
Work activities
O*NET work activity · derivedEffectiveness at: Evaluate designs or specifications to ensure quality.
Work activities
O*NET work activity · derivedEffectiveness at: Review technical documents to plan work.
Work activities
O*NET work activity · derivedEffectiveness at: Document technical design details.
Work activities
O*NET work activity · derivedEffectiveness at: Document design or operational test results.
Work activities
O*NET work activity · derivedEffectiveness at: Provide technical guidance to other personnel.
Work activities
O*NET work activity · derivedEffectiveness at: Evaluate characteristics of equipment or systems.
Work activities
O*NET work activity · derivedEffectiveness at: Develop technical methods or processes.
Work activities
O*NET work activity · derivedEffectiveness at: Inspect facilities or sites to determine if they meet specifications or standards.
Work activities
O*NET work activity · derivedEffectiveness at: Determine operational methods.
Structured-interview dimensions
The work-style constructs a structured interview for this occupation should probe (importance-ranked). Pair with past-behavior questions and anchored rating scales — the evidence-backed format.
Level-calibrated behavioral anchors 28
Verbatim anchors from open leveled frameworks, mapped onto this profile's level (basis: derived — competency-scoped, not per-criterion). Use them to calibrate what "exceeds / meets" looks like at this level.
Creativity and Innovation
OPM Leadership Proficiency Levels · Level 4 - AdvancedCreates new methods for planning, designing, and carrying out program objectives Organizes and leads cross-divisional work group in developing creative solutions to address problems Creates new units to streamline functions based on work flow analysis
External Awareness
OPM Leadership Proficiency Levels · Level 4 - AdvancedProvides policy advice to officials which are consistent with local, national, and international policies and trends Reflects industry best practices in the development of agency-wide policies and procedures
Flexibility
OPM Leadership Proficiency Levels · Level 4 - AdvancedAdjusts organizational priorities quickly as situations change Shifts agency goals and initiatives to align with administration and Congressional priorities
Resilience
OPM Leadership Proficiency Levels · Level 4 - AdvancedResponds to setbacks by developing alternative approaches to determine the best course of action Maintains unit's effectiveness, quality, and morale during organizational change Cultivates internal and external stakeholders to develop strategies for obtaining funding from alternate sources following budget cuts
Strategic Thinking
OPM Leadership Proficiency Levels · Level 4 - AdvancedLeads and directs a strategic planning team to address and outline the future direction of an organization Establishes strategic performance measures to allow the organization to continually assess and adjust program direction
Vision
OPM Leadership Proficiency Levels · Level 4 - AdvancedDirects and provides guidance to managers to develop long-term strategic plan for the division Educates agency officials about new system and outlines how the long-term benefits align with agency goals Conducts workshop with employees, human resources staff, and customers to build a vision, strategy, and goals for the unit
Conflict Management
OPM Leadership Proficiency Levels · Level 4 - AdvancedRecognizes conflict and takes steps to address issues by meeting with the involved parties Mitigates staff concerns regarding agency-wide issues by investigating allegations and taking appropriate action
Leveraging Diversity
OPM Leadership Proficiency Levels · Level 4 - AdvancedBuilds a diverse staff with a variety of skills who function effectively to accomplish the mission of the organization Develops a creative initiative focused on recognizing the various dimensions of diversity to encourage inclusiveness in the workplace
Developing Others
OPM Leadership Proficiency Levels · Level 4 - AdvancedRecommends details and developmental assignments to staff based on career interests and work unit needs Recognizes staff potential and guides employees in developing skills by recommending appropriate training and sources of information Works with staff to develop individual development plans addressing employee needs and meeting organizational goals
Team Building
OPM Leadership Proficiency Levels · Level 4 - AdvancedPromotes cohesiveness of a dysfunctional team by defining roles and responsibilities of each team member and establishing overall objectives Leads teams to implement Congressional programs and interact with legislative representatives Motivates agency-wide team by assigning work based on team member skill level and area of interest
Accountability
OPM Leadership Proficiency Levels · Level 4 - AdvancedProvides and promotes position information across divisions to educate staff on respective duties, performance expectations, and consequent impact on accomplishment of agency goals Holds staff accountable for new performance standards and expectations by taking action with employees not meeting standards
Customer Service
OPM Leadership Proficiency Levels · Level 4 - AdvancedAnticipates growing customer needs and expectations to continuously improve product development and service delivery Creates work group consisting of stakeholders and neutral parties to develop solutions to customer service barriers
Decisiveness
OPM Leadership Proficiency Levels · Level 4 - AdvancedChanges course of action despite public support when new information indicates previous strategy would not succeed Makes timely decisions using available information regarding severe operating budget reductions including possible reductions in force (RIFs)
Entrepreneurship
OPM Leadership Proficiency Levels · Level 4 - AdvancedTakes calculated risks by creating new and innovative business lines Conducts research and develops business proposals resulting in a high return on investment
Problem Solving
OPM Leadership Proficiency Levels · Level 4 - AdvancedSynthesizes information from internal and external sources to develop an action plan addressing program issues Addresses systemic barriers inhibiting the achievement of results by forming teams to conduct focus groups and develop solutions
Technical Credibility
OPM Leadership Proficiency Levels · Level 4 - AdvancedProvides expertise in technical subject area to an organization or team Develops technical portions of agency guidelines for internal and external use Evaluates, incorporates, and communicates the latest developments in specialty area through agency guidelines and criteria Provides technical expertise in the design and implementation of agency-wide projects
Financial Management
OPM Leadership Proficiency Levels · Level 4 - AdvancedDevelops and implements new procurement system to support agency program within time and budgetary constraints Ensures financial commitments and deadlines are met by facilitating and assessing processes, situations, and issues and takes corrective action, as needed Considers implications of financial decisions and suggests methods for meeting needs of staff and the organization overall Develops, justifies, and manages organization- wide budgets for annual projects and programs
Human Capital Management
OPM Leadership Proficiency Levels · Level 4 - AdvancedDevelops rewards system to recognize the impact of employee contributions to the organization Identifies creative strategies to recruit employees with the required skills and qualifications, despite having limited resources Identifies mission critical occupations and associated competencies needed to perform organizational functions
Technology Management
OPM Leadership Proficiency Levels · Level 4 - AdvancedImproves ability of agency to gather and act on data from stakeholders by using online surveys and related IT tools Improves agency productivity by expanding the use of existing IT applications for use by clients and staff
Partnering
OPM Leadership Proficiency Levels · Level 4 - AdvancedCollaborates with headquarters, regional offices, and key stakeholders to implement new initiatives Partners with various parties by sharing information and resources across multiple levels to establish new programs
Political Savvy
OPM Leadership Proficiency Levels · Level 4 - AdvancedEnsures staff understands documentation and required metrics to analyze political issues Meets with community leaders to discuss political issues and address concerns Establishes a clear vision for the organization by meeting with managers agency-wide to ensure initiatives are understood Addresses controversial political issues by conducting research and considering best practices
Influencing/Negotiating
OPM Leadership Proficiency Levels · Level 4 - AdvancedNegotiates with leaders for changes to reorganization design based on feedback from subordinates Develops plan and convinces high-level agency officials to adopt approach by meeting with officials to explain points Guides a team of experts to provide advice on, and build credibility for, a multi-level negotiation process
Interpersonal Skills
OPM Leadership Proficiency Levels · Level 4 - AdvancedTreats individuals from all levels of the agency with courtesy and sensitivity Meets with staff and listens to their perspective on organizational policies and procedures
Oral Communication
OPM Leadership Proficiency Levels · Level 4 - AdvancedConducts presentations and briefings for high- level agency officials Presents, explains, and defends agency positions and proposals to staff and stakeholders
Integrity/Honesty
OPM Leadership Proficiency Levels · Level 4 - AdvancedInstills a climate of trust by admitting own mistakes and taking responsibility for one's actions Discusses potential ethical problems and wrong- doing with employees and responds appropriately
Written Communication
OPM Leadership Proficiency Levels · Level 4 - AdvancedWrites complex technical reports using clear terminology and a concise format for use by high- level decision makers Reviews technical reports, edits materials, and provides suggestions to improve clarity while ensuring documents are targeted to the intended audience
Continual Learning
OPM Leadership Proficiency Levels · Level 4 - AdvancedCompletes leadership development program including training, coaching, and mentoring opportunities and applies key learnings Arranges and completes rotational assignment meeting own developmental goals and aligning with organizational strategies
Public Service Motivation
OPM Leadership Proficiency Levels · Level 4 - AdvancedPartners with community leaders to develop neighborhood action plans Cultivates relationships with community stakeholders to validate usefulness of proposed products and services
This page includes information from the O*NET 30.3 Database by the U.S. Department of Labor, Employment and Training Administration (USDOL/ETA). Used under the CC BY 4.0 license (https://creativecommons.org/licenses/by/4.0/). O*NET® is a trademark of USDOL/ETA. USDOL/ETA has modified all or some of this information. USDOL/ETA has not approved, endorsed, or tested these modifications.
Own the full kit — $29
The complete work-products kit for one canonical job profile: level-scoped evaluation criteria with BARS frames, structured-interview dimensions and guide, performance criteria, and goal/scorecard templates — all canon-grounded and basis-labeled.
Assessment Kit — One Profile
$29The complete work-products kit for one canonical job profile: level-scoped evaluation criteria with BARS frames, structured-interview dimensions and guide, performance criteria, and goal/scorecard templates — all canon-grounded and basis-labeled.
Assessment Kit — Family Bundle
$99Work-products kits for every level and focus in one job family — the hiring-manager shape: assess, interview, and set goals across the whole ladder consistently.
Assessment Kits — All Access (Monthly)
$49/moEvery work-products kit across all canonical profiles, refreshed as source editions land.
Assessment Kits — All Access (Annual)
$490/yrEvery work-products kit across all canonical profiles, refreshed as source editions land. Annual billing (two months free).
This page is the kit's free demonstration and stays free. The paid kit is the complete work-products export for the profile.